BC Major Projects Inventory: Proposed: Consultation/Approvals (as of 30 Sep 2025)

Stage
Proposedreported 30 Sep 2025
Value
C$46Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Pristine Power Inc./Cheslatta Forest Products
Last checked
30 Sep 2025

Stage timeline

  1. Proposedreported 30 Sep 2025
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

Proposed 10 MW power plant, located near Cheslatta Forest Products, to use gasification technology to convert wood residue into electricity for 9500 homes. Cost of project includes transmission line to BC Hydro's power grid. Project requires provincial and BC Hydro approvals.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Dams and power generation (hydro) · Dams and power generation in British Columbia
Location
Burns Lake
Municipality
Burns Lake
Province or state
British Columbia, Canada · All of Canada

Nearby projects

Latest updates

Stage history

  1. Proposed BC Major Projects Inventory: Proposed: Consultation/Approvals (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.