Kicking Horse River Bridge Replacement

BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

May be complete: the estimated completion (Q4 2026) has passed, and no newer source says so either way.

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Under constructionreported 30 Sep 2025
Value
C$90Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
BC Ministry of Transportation and Transit
Last checked
30 Sep 2025

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 30 Sep 2025
  4. CompleteNot yet

Project to replace Kicking Horse River bridges 1 and 2 along Hwy 95. The $45 million contract has been awarded to Copcan Civil Limited Partnership. Funding will be provided by the provincial government ($60.9 million) and the federal government ($28.7 million).

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Bridges and tunnels (bridge) · Bridges and tunnels in British Columbia
Location
Golden (approximate location: placed at the municipality)
Municipality
Golden
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q4 2026 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Under construction BC Major Projects Inventory: Construction started (as of 30 Sep 2025)