Owl River Solar Project (Phase 1 - 3)

NRCan Major Projects Inventory: Announced & Planning (as of 1 Oct 2025)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Proposedreported Oct 2025
Value
C$110Mfrom NRCan Major Projects Inventory
Capacity
Not published
Owner
The Owl River Métis Community and Culture Pathway Development Corp.
Last checked
1 Oct 2025

Stage timeline

  1. Proposedreported Oct 2025
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

Facts

Type
Dams and power generation (solar) · Dams and power generation in Alberta
Location
Lac la Biche County (approximate location: placed at the municipality)
Municipality
Lac la Biche County
Province or state
Alberta, Canada · All of Canada

Nearby projects

  • Grouse (Phase 1) · Pipelines, oil and gas · Approved · about 32 km away (an approximate location)
  • Pike (Formely Kirby) · Pipelines, oil and gas · Under construction · about 34 km away (an approximate location)
  • BlackGold Oil Sands Project · Pipelines, oil and gas · Proposed · about 35 km away (an approximate location)
  • Jackfish (Phase 4) · Pipelines, oil and gas · Proposed · about 35 km away (an approximate location)
  • Pike (Phase 2) · Pipelines, oil and gas · Proposed · about 36 km away (an approximate location)

Latest updates

Stage history

  1. Proposed NRCan Major Projects Inventory: Announced & Planning (as of 1 Oct 2025)

Sources

Licences: Open Government Licence – Canada. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.