Owl River Solar Project (Phase 1 - 3)
NRCan Major Projects Inventory: Announced & Planning
(as of 1 Oct 2025)
Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.
- Stage
- Proposedreported Oct 2025
- Value
- C$110Mfrom NRCan Major Projects Inventory
- Capacity
- Not published
- Owner
- The Owl River Métis Community and Culture Pathway Development Corp.
- Last checked
- 1 Oct 2025
Stage timeline
- Proposedreported Oct 2025
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
Facts
- Location
- Lac la Biche County (approximate location: placed at the municipality)
- Municipality
- Lac la Biche County
- Province or state
- Alberta, Canada · All of Canada
Nearby projects
- Grouse (Phase 1) · Pipelines, oil and gas · Approved · about 32 km away (an approximate location)
- Pike (Formely Kirby) · Pipelines, oil and gas · Under construction · about 34 km away (an approximate location)
- BlackGold Oil Sands Project · Pipelines, oil and gas · Proposed · about 35 km away (an approximate location)
- Jackfish (Phase 4) · Pipelines, oil and gas · Proposed · about 35 km away (an approximate location)
- Pike (Phase 2) · Pipelines, oil and gas · Proposed · about 36 km away (an approximate location)
Latest updates
- : first recorded here. NRCan Major Projects Inventory, 1 Oct 2025 edition.
Stage history
- Proposed NRCan Major Projects Inventory:
Announced & Planning
(as of 1 Oct 2025)
Sources
- NRCan Major Projects Inventory: MPI 2025 project 9006 (as of 1 Oct 2025)
Licences: Open Government Licence – Canada. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.