Northwest Langley Wastewater Treatment Plant Expansion
BC Major Projects Inventory: Proposed: Tender/Preconstruction
(as of 30 Sep 2025)
Approximate location: the map's point marks the area, not the exact site.
- Stage
- Proposedreported 30 Sep 2025
- Value
- C$2.3Bfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- Township of Langley
- Last checked
- 1 Oct 2026
Stage timeline
- Proposedreported 30 Sep 2025
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
Facts
- Location
- 102B Ave and 201 St, Township of Langley, BC (approximate location)
- Municipality
- Langley (Township)
- Province or state
- British Columbia, Canada · All of Canada
- Estimated start
- Q1 2027 from BC Major Projects Inventory
- Estimated completion
- Q4 2030 from BC Major Projects Inventory
Nearby projects
- Pitt Meadows Road and Rail Improvements Project · Highways and railroads · Proposed · about 4 km away (an approximate location)
- Operations and Maintenance Centre #5 · Transit · Proposed · about 8 km away (an approximate location)
- Highway 1 Widening - 216 Street to 264 Street · Highways and railroads · Under construction · about 8 km away (an approximate location)
- Surrey Langley Skytrain · Transit · Under construction · about 9 km away (an approximate location)
- Fleetwood - Distribution Load Interconnection (SLS Servicing) Project · Transmission lines · Under construction · about 10 km away (an approximate location)
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Proposed BC Major Projects Inventory:
Proposed: Tender/Preconstruction
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 4319 (as of 30 Sep 2025)
- Location source (hand-placed): metrovancouver.org
Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.