2L333 - Load Interconnection - Enbridge APP CS16 Project

BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

May be complete: the estimated completion (Q2 2026) has passed, and no newer source says so either way.

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Under constructionreported 30 Sep 2025
Value
C$132Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Not published
Last checked
30 Sep 2025

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 30 Sep 2025
  4. CompleteNot yet

This project is to connect the Enbridge Westcoast CS16 facility to BC Hydro's transmission grid.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Transmission lines (line) · Transmission lines in British Columbia
Location
Logan Lake (approximate location: placed at the municipality)
Municipality
Logan Lake
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q2 2026 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Under construction BC Major Projects Inventory: Construction started (as of 30 Sep 2025)