Biomass Project - McBride
BC Major Projects Inventory: Proposed: Preliminary/Feasibility
(as of 30 Sep 2025)
- Stage
- Proposedreported 30 Sep 2025
- Value
- C$140Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- ecoTECH Energy Group (Canada) Inc.
- Last checked
- 30 Sep 2025
Stage timeline
- Proposedreported 30 Sep 2025
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
Project to include a combined heat and electricity generating station. Phase 1 will produce a total of 7 MW of power and will be followed by phase 2 planned for 24 MW. Phase 3 is in the planning stages. Rezoning and permitting are in place and establishment of temporary housing for workers.
Facts
- Location
- McBride
- Municipality
- McBride
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- Robson Valley Hydroelectric Project · Dams and power generation · Approved · about 29 km away
- Canoe Reach Geothermal Energy Project · Dams and power generation · Proposed · about 88 km away (an approximate location)
- Bonanza Ledge Mine · Mines · Proposed · about 90 km away
- Cariboo Gold Project · Mines · Approved · about 90 km away
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Proposed BC Major Projects Inventory:
Proposed: Preliminary/Feasibility
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 2745 (as of 30 Sep 2025)
Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.