Build Almanac

Menu

Show on map

Biomass Project - McBride

BC Major Projects Inventory: Proposed: Preliminary/Feasibility (as of 30 Sep 2025)

Stage
Proposedreported 30 Sep 2025
Value
C$140Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
ecoTECH Energy Group (Canada) Inc.
Last checked
30 Sep 2025

Stage timeline

  1. Proposedreported 30 Sep 2025
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

Project to include a combined heat and electricity generating station. Phase 1 will produce a total of 7 MW of power and will be followed by phase 2 planned for 24 MW. Phase 3 is in the planning stages. Rezoning and permitting are in place and establishment of temporary housing for workers.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Dams and power generation (biomass) · Dams and power generation in British Columbia
Location
McBride
Municipality
McBride
Province or state
British Columbia, Canada · All of Canada

Nearby projects

Latest updates

Stage history

  1. Proposed BC Major Projects Inventory: Proposed: Preliminary/Feasibility (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.