Zanardi Bridge and Causeway Upgrades

BC Major Projects Inventory: Proposed: Tender/Preconstruction (as of 30 Sep 2025)

May be complete: the estimated completion (Q2 2026) has passed, and no newer source says so either way.

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Proposedreported 30 Sep 2025
Value
C$122Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Prince Rupert Port Authority/ CN
Last checked
30 Sep 2025

Stage timeline

  1. Proposedreported 30 Sep 2025
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

Proposed rehabilitation of existing bridge and construction of a new 2-track bridge at the Port of Prince Rupert Gateway. Federal funding of 60.6 million will be provided.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Bridges and tunnels (bridge) · Bridges and tunnels in British Columbia
Location
Prince Rupert (approximate location: placed at the municipality)
Municipality
Prince Rupert
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q2 2026 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Proposed BC Major Projects Inventory: Proposed: Tender/Preconstruction (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.