Pierre-Laporte Bridge: suspender replacement and main cable dehumidification

Authority's own page: The works contract was concluded on 24 September 2026, for a planned 51 months. (as of 12 Nov 2026)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Under constructionreported 12 Nov 2026
Value
C$109Mfrom Authority's own page
Capacity
Not published
Owner
Ministère des Transports et de la Mobilité durable
Last checked
11 Nov 2026

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 12 Nov 2026
  4. CompleteNot yet

Facts

Type
Bridges and tunnels (bridge) · Bridges and tunnels in Canada
Location
Québec (approximate location: placed at the municipality)
Municipality
Québec
Province or state
Quebec, Canada · All of Canada

Nearby projects

Latest updates

  • : works contract awarded to CONSTRUCTION GÉNIX INC., C$109M, to 24 Dec 2030: Contrat suivant la qualif. en travaux complexes de const./réparation d'ouvrages d'art selon la liste en vigueur au dépôt de la soumission pour le remplacement des suspentes du pont Pierre-Laporte (Chaudière-Appalaches). SEAO notice.
  • : first recorded here. Authority's own page, 12 Nov 2026 edition.

Stage history

  1. Under construction Authority's own page: The works contract was concluded on 24 September 2026, for a planned 51 months. (as of 12 Nov 2026)

Sources

Licences: Open Government Licence – Canada; Creative Commons Attribution 4.0 International, selected and reformatted by Build Almanac. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.