Blackwater Rd at Knickerbocker Rd Realignment
BC Major Projects Inventory: Construction started
(as of 30 Sep 2025)
May be complete: the estimated completion (Q4 2026) has passed, and no newer source says so either way.
Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.
- Stage
- Under constructionreported 30 Sep 2025
- Value
- C$203Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Last checked
- 30 Sep 2025
Stage timeline
- ProposedNot reported
- ApprovedNot reported
- Under constructionreported 30 Sep 2025
- CompleteNot yet
Project to reinforce and realign a damaged segment of Blackwater Rd at Knickerbocker Road due to landslide.
Facts
- Location
- Quesnel (approximate location: placed at the municipality)
- Municipality
- Quesnel
- Province or state
- British Columbia, Canada · All of Canada
- Estimated completion
- Q4 2026 from BC Major Projects Inventory
Nearby projects
- Highway 97 - Cottonwood Hill · Highways and railroads · Under construction · under 1 km away (an approximate location)
- Nilhts'i Ecoener Project · Dams and power generation · Proposed · about 51 km away (an approximate location)
- Cariboo Gold Project · Mines · Approved · about 65 km away (an approximate location)
- Bonanza Ledge Mine · Mines · Proposed · about 66 km away (an approximate location)
- Spanish Mountain Copper-Gold Mines · Mines · Proposed · about 88 km away (an approximate location)
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Under construction BC Major Projects Inventory:
Construction started
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 4654 (as of 30 Sep 2025)
Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.