Frontier data center campus

Data-centre campus pages (hand-curated): Under construction; the first building is due in the second half of 2026 (Vantage, 19 Aug 2025). (as of 3 Nov 2026)

Approximate location: the source names only the county or town, so the map places this project at the Census Bureau's point for it (from its Gazetteer files), not at its site.

Stage
Under constructionreported 3 Nov 2026
Value
US$25Bfrom Data-centre campus pages (hand-curated)
Capacity
1,400 MW power demand (IT load)
Owner
Vantage Data Centers
Last checked
3 Nov 2026

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 3 Nov 2026
  4. CompleteNot yet

Facts

Type
Data centres · Data centres in Texas
Location
Shackelford County (approximate location: placed at the county or town)
Municipality
Shackelford County
Province or state
Texas, United States · All of the United States

Nearby projects

  • Funston Solar · Dams and power generation · Under construction · about 35 km away (an approximate location)
  • Quantum BESS · Dams and power generation · Under construction · about 36 km away (an approximate location)
  • Quantum Solar · Dams and power generation · Under construction · about 36 km away (an approximate location)
  • Enbridge Solar (Sequoia II) · Dams and power generation · Under construction · about 48 km away (an approximate location)
  • Quantum II BESS · Dams and power generation · Under construction · about 48 km away (an approximate location)

Latest updates

Stage history

  1. Under construction Data-centre campus pages (hand-curated): Under construction; the first building is due in the second half of 2026 (Vantage, 19 Aug 2025). (as of 3 Nov 2026)

Sources

Licences: US federal government work (public domain). Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.