Frontier data center campus
Data-centre campus pages (hand-curated): Under construction; the first building is due in the second half of 2026 (Vantage, 19 Aug 2025).
(as of 3 Nov 2026)
Approximate location: the source names only the county or town, so the map places this project at the Census Bureau's point for it (from its Gazetteer files), not at its site.
- Stage
- Under constructionreported 3 Nov 2026
- Value
- US$25Bfrom Data-centre campus pages (hand-curated)
- Capacity
- 1,400 MW power demand (IT load)
- Owner
- Vantage Data Centers
- Last checked
- 3 Nov 2026
Stage timeline
- ProposedNot reported
- ApprovedNot reported
- Under constructionreported 3 Nov 2026
- CompleteNot yet
Facts
- Location
- Shackelford County (approximate location: placed at the county or town)
- Municipality
- Shackelford County
- Province or state
- Texas, United States · All of the United States
Nearby projects
- Funston Solar · Dams and power generation · Under construction · about 35 km away (an approximate location)
- Quantum BESS · Dams and power generation · Under construction · about 36 km away (an approximate location)
- Quantum Solar · Dams and power generation · Under construction · about 36 km away (an approximate location)
- Enbridge Solar (Sequoia II) · Dams and power generation · Under construction · about 48 km away (an approximate location)
- Quantum II BESS · Dams and power generation · Under construction · about 48 km away (an approximate location)
Latest updates
- : first recorded here. Data-centre campus pages (hand-curated), 3 Nov 2026 edition.
Stage history
- Under construction Data-centre campus pages (hand-curated):
Under construction; the first building is due in the second half of 2026 (Vantage, 19 Aug 2025).
(as of 3 Nov 2026)
Sources
- Data-centre campus pages (hand-curated): vantage-frontier (as of 3 Nov 2026)