Creative Energy Plant
NRCan Major Projects Inventory: Under Construction
(as of 1 Oct 2025)
May be complete: the estimated completion (Q1 2026) has passed, and no newer source says so either way.
- Stage
- Under constructionsince Q1 2023
- Value
- C$100Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- Creative Energy Vancouver Platforms Inc.
- Last checked
- 1 Oct 2026
Stage timeline
- ProposedNot reported
- ApprovedNot reported
- Under constructionQ1 2023
- CompleteNot yet
Plan to convert former Central Heat Distribution Inc. natural gas steam plant at 720 Beatty St to a low-carbon energy system, utilizing boilers and underground system to heat downtown Vancouver.
Facts
- Location
- 720 Beatty St
- Municipality
- Vancouver
- Province or state
- British Columbia, Canada · All of Canada
- Estimated completion
- Q1 2026 from BC Major Projects Inventory
Nearby projects
- Broadway Subway Project · Transit · Under construction · about 2 km away
- East Vancouver Substation · Transmission lines · Proposed · about 3 km away (an approximate location)
- North Shore Wastewater Treatment Plant (formerly Lions Gate Sewerage) · Water and wastewater · Under construction · about 4 km away
- G3 Terminal Vancouver · Ports · Under construction · about 6 km away
- Mainwaring Station Upgrade Project · Transmission lines · Under construction · about 6 km away
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Under construction BC Major Projects Inventory:
Construction started
, Q1 2023 (as of 30 Sep 2025) - Under construction NRCan Major Projects Inventory:
Under Construction
(as of 1 Oct 2025)
Sources
- BC Major Projects Inventory: MPI project 3408 (as of 30 Sep 2025)
- NRCan Major Projects Inventory: MPI 2025 project 0970 (as of 1 Oct 2025)
Licences: Open Government Licence – British Columbia; Open Government Licence – Canada. Full credits: Data sources and licences.