Build Almanac

Menu

Show on map

Abilene AI data center campus

Data-centre campus pages (hand-curated): Phase 1 operating since 30 Sep 2025; the later buildings of the eight-building campus are being built. (as of 3 Nov 2026)

Approximate location: the source names only the county or town, so the map places this project at the Census Bureau's point for it (from its Gazetteer files), not at its site.

Stage
Under constructionreported 3 Nov 2026
Value
Not published
Capacity
1,200 MW power demand (campus total)
Owner
Crusoe
Last checked
3 Nov 2026

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 3 Nov 2026
  4. CompleteNot yet

Facts

Type
Data centres · Data centres in Texas
Location
Abilene (approximate location: placed at the county or town)
Municipality
Abilene
Province or state
Texas, United States · All of the United States

Nearby projects

  • Abilene second AI data center campus · Data centres · Under construction · under 1 km away (an approximate location)
  • Funston Solar · Dams and power generation · Under construction · about 37 km away (an approximate location)
  • Tiger Solar · Dams and power generation · Under construction · about 40 km away (an approximate location)
  • Anson 2 Solar · Dams and power generation · Under construction · about 43 km away (an approximate location)
  • Jones City 1 Solar · Dams and power generation · Under construction · about 44 km away (an approximate location)

Latest updates

Stage history

  1. Under construction Data-centre campus pages (hand-curated): Phase 1 operating since 30 Sep 2025; the later buildings of the eight-building campus are being built. (as of 3 Nov 2026)

Sources

  • Data-centre campus pages (hand-curated): crusoe-abilene (as of 3 Nov 2026)

Licences: US federal government work (public domain). Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.