Abilene AI data center campus
Data-centre campus pages (hand-curated): Phase 1 operating since 30 Sep 2025; the later buildings of the eight-building campus are being built.
(as of 3 Nov 2026)
Approximate location: the source names only the county or town, so the map places this project at the Census Bureau's point for it (from its Gazetteer files), not at its site.
- Stage
- Under constructionreported 3 Nov 2026
- Value
- Not published
- Capacity
- 1,200 MW power demand (campus total)
- Owner
- Crusoe
- Last checked
- 3 Nov 2026
Stage timeline
- ProposedNot reported
- ApprovedNot reported
- Under constructionreported 3 Nov 2026
- CompleteNot yet
Facts
- Location
- Abilene (approximate location: placed at the county or town)
- Municipality
- Abilene
- Province or state
- Texas, United States · All of the United States
Nearby projects
- Abilene second AI data center campus · Data centres · Under construction · under 1 km away (an approximate location)
- Funston Solar · Dams and power generation · Under construction · about 37 km away (an approximate location)
- Tiger Solar · Dams and power generation · Under construction · about 40 km away (an approximate location)
- Anson 2 Solar · Dams and power generation · Under construction · about 43 km away (an approximate location)
- Jones City 1 Solar · Dams and power generation · Under construction · about 44 km away (an approximate location)
Latest updates
- : first recorded here. Data-centre campus pages (hand-curated), 3 Nov 2026 edition.
Stage history
- Under construction Data-centre campus pages (hand-curated):
Phase 1 operating since 30 Sep 2025; the later buildings of the eight-building campus are being built.
(as of 3 Nov 2026)
Sources
- Data-centre campus pages (hand-curated): crusoe-abilene (as of 3 Nov 2026)
Licences: US federal government work (public domain). Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.