Bridge River 1 Replace Units 1-4 Generators / Governors Project

NRCan Major Projects Inventory: Approved (as of 1 Oct 2025)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Approvedreported Oct 2025
Value
C$313Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Not published
Last checked
30 Sep 2025

Stage timeline

  1. Proposedreported 30 Sep 2025
  2. Approvedreported Oct 2025
  3. Under constructionNot yet
  4. CompleteNot yet

This project is required to address the deteriorating condition of the aging generators, governors, excitors, and control systems at the Bridge River 1 generating station.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Dams and power generation (hydro) · Dams and power generation in British Columbia
Location
Lillooet (approximate location: placed at the municipality)
Municipality
Lillooet
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q2 2032 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Proposed BC Major Projects Inventory: Proposed: Tender/Preconstruction (as of 30 Sep 2025)
  2. Approved NRCan Major Projects Inventory: Approved (as of 1 Oct 2025)