Hurley River Watershed Hydropower Project

BC Major Projects Inventory: Proposed: Consultation/Approvals (as of 30 Sep 2025)

Stage
Proposedreported 30 Sep 2025
Value
C$138Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Hurley River Hydro LP
Last checked
30 Sep 2025

Stage timeline

  1. Proposedreported 30 Sep 2025
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

46 MW run-of-river hydroelectric project located near Pemberton would divert flow of Hurley River to a powerhouse into Downton Lake above Lajoie Dam. The project is listed in the BC Hydro 2008 Clean Power Call.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Dams and power generation (hydro) · Dams and power generation in British Columbia
Location
Pemberton
Municipality
Pemberton
Province or state
British Columbia, Canada · All of Canada

Nearby projects

Latest updates

Stage history

  1. Proposed BC Major Projects Inventory: Proposed: Consultation/Approvals (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.