Phantom Lake Hydropower Project

BC Major Projects Inventory: On hold (as of 30 Sep 2025)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
On holdreported 30 Sep 2025
Value
C$35Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Hydromax Energy Ltd.
Last checked
30 Sep 2025

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

On hold reported 30 Sep 2025

Proposed 15 MW hydropower project is under consideration in the BC Hydro 2008 Clean Power Call. Project is on hold.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Dams and power generation (hydro) · Dams and power generation in British Columbia
Location
Sechelt (approximate location: placed at the municipality)
Municipality
Sechelt
Province or state
British Columbia, Canada · All of Canada

Nearby projects

Latest updates

Stage history

  1. On hold BC Major Projects Inventory: On hold (as of 30 Sep 2025)