Phantom Lake Hydropower Project
BC Major Projects Inventory: On hold
(as of 30 Sep 2025)
Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.
- Stage
- On holdreported 30 Sep 2025
- Value
- C$35Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- Hydromax Energy Ltd.
- Last checked
- 30 Sep 2025
Stage timeline
- ProposedNot reported
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
On hold reported 30 Sep 2025
Proposed 15 MW hydropower project is under consideration in the BC Hydro 2008 Clean Power Call. Project is on hold.
Facts
- Location
- Sechelt (approximate location: placed at the municipality)
- Municipality
- Sechelt
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- BURNCO Aggregate Project · Mines · Proposed · about 31 km away (an approximate location)
- Duke Point Terminal Expansion · Ports · Proposed · about 38 km away (an approximate location)
- Horseshoe Bay Terminal Upgrades · Ports · Proposed · about 39 km away (an approximate location)
- Woodfibre LNG Project · Pipelines, oil and gas · Under construction · about 44 km away (an approximate location)
- Iona Island Wastewater Treatment Plant Upgrades · Water and wastewater · Proposed · about 51 km away (an approximate location)
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- On hold BC Major Projects Inventory:
On hold
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 2526 (as of 30 Sep 2025)
Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.