BURNCO Aggregate Project
BC Major Projects Inventory: Proposed
(as of 30 Sep 2025)
- Stage
- Proposedreported 30 Sep 2025
- Value
- C$60Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- BURNCO Rock Products Ltd.
- Last checked
- 30 Sep 2025
Stage timeline
- Proposedreported 30 Sep 2025
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
Sand and gravel pit and processing plant located on the northwest shore of Howe Sound will have a production capacity of 1 to 1.5 million tonnes/year for a 16 yr mine life. A marine loading facility, maintenance building, small craft dock and electrical substation will be included in the project.
Facts
- Location
- Gibsons
- Municipality
- Gibsons
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- Woodfibre LNG Project · Pipelines, oil and gas · Under construction · about 15 km away
- Horseshoe Bay Terminal Upgrades · Ports · Proposed · about 23 km away
- Phantom Lake Hydropower Project · Dams and power generation · On hold · about 31 km away (an approximate location)
- North Shore Wastewater Treatment Plant (formerly Lions Gate Sewerage) · Water and wastewater · Under construction · about 34 km away
- Creative Energy Plant · Dams and power generation · Under construction · about 38 km away
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Proposed BC Major Projects Inventory:
Proposed
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 2503 (as of 30 Sep 2025)
Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.