Campbell River Power Enterprises
BC Major Projects Inventory: Proposed
(as of 30 Sep 2025)
Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.
- Stage
- Proposedreported 30 Sep 2025
- Value
- C$105Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- 0887572 B.C. Ltd.
- Last checked
- 30 Sep 2025
Stage timeline
- Proposedreported 30 Sep 2025
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
Proposed 35 MW wood-residue power station. Project has been selected to proceed in the Phase 2 Bioenergy Call for Power.
Facts
- Location
- Campbell River (approximate location: placed at the municipality)
- Municipality
- Campbell River
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- Brewster Wind Farm · Dams and power generation · Proposed · under 1 km away (an approximate location)
- John Hart Dam Seismic Upgrade Project · Dams and power generation · Under construction · under 1 km away (an approximate location)
- Ladore Spillway Seismic Upgrade Project · Dams and power generation · Under construction · under 1 km away (an approximate location)
- Strathcona Discharge Upgrade Project · Dams and power generation · Under construction · under 1 km away (an approximate location)
- Hawkeye Green Energy Grid Project · Dams and power generation · Proposed · about 58 km away (an approximate location)
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Proposed BC Major Projects Inventory:
Proposed
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 2743 (as of 30 Sep 2025)
Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.