Hawkeye Green Energy Grid Project
NRCan Major Projects Inventory: In Review
(as of 1 Oct 2025)
- Stage
- Proposedreported 30 Sep 2025
- Value
- C$450Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- Hawkeye Energy Corp.
- Last checked
- 30 Sep 2025
Stage timeline
- Proposedreported 30 Sep 2025
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
Proposed 151 MW hydroelectric project located near the Toba and Jarvis Inlets, will consist of 12 run-of-river sites and a 150 km transmission line. Project is in the pre-application phase under the Environmental Assessment Act.
Facts
- Location
- Powell River
- Municipality
- Powell River
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- Brewster Wind Farm · Dams and power generation · Proposed · about 58 km away (an approximate location)
- Campbell River Power Enterprises · Dams and power generation · Proposed · about 58 km away (an approximate location)
- John Hart Dam Seismic Upgrade Project · Dams and power generation · Under construction · about 58 km away (an approximate location)
- Ladore Spillway Seismic Upgrade Project · Dams and power generation · Under construction · about 58 km away (an approximate location)
- Strathcona Discharge Upgrade Project · Dams and power generation · Under construction · about 58 km away (an approximate location)
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Proposed BC Major Projects Inventory:
Proposed: Consultation/Approvals
(as of 30 Sep 2025) - Proposed NRCan Major Projects Inventory:
In Review
(as of 1 Oct 2025)
Sources
- BC Major Projects Inventory: MPI project 2267 (as of 30 Sep 2025)
- NRCan Major Projects Inventory: MPI 2025 project 0208 (as of 1 Oct 2025)
Licences: Open Government Licence – British Columbia; Open Government Licence – Canada. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.