Build Almanac

Menu

Show on map

John Hart Dam Seismic Upgrade Project

NRCan Major Projects Inventory: Under Construction (as of 1 Oct 2025)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Under constructionreported 30 Sep 2025
Value
C$912Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Not published
Last checked
30 Sep 2025

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 30 Sep 2025
  4. CompleteNot yet

This project will address dam safety risks at the John Hart dam and will significantly improve the overall seismic withstand of the dam structure, the reliability of the spillway gates system, and address inflow imbalance issues between the Ladore dam and John Hart dam.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Dams and power generation (hydro) · Dams and power generation in British Columbia
Location
Campbell River (approximate location: placed at the municipality)
Municipality
Campbell River
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q3 2029 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Under construction BC Major Projects Inventory: Construction started (as of 30 Sep 2025)
  2. Under construction NRCan Major Projects Inventory: Under Construction (as of 1 Oct 2025)

Sources

Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.