Snowfield Gold Project
BC Major Projects Inventory: On hold
(as of 30 Sep 2025)
- Stage
- On holdreported 30 Sep 2025
- Value
- C$3.4Bfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- Pretium Resources Inc.
- Last checked
- 30 Sep 2025
Stage timeline
- ProposedNot reported
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
On hold reported 30 Sep 2025
Proposed 120,000 t/day open pit operation, located 65 km north of Stewart, to include production of Gold-silver doré, copper-gold-silver concentrate, and molybdenum-rhenium concentrate.
Facts
- Location
- Iskut
- Municipality
- Iskut
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- Kerr - Sulphurets - Mitchell (KSM) Gold/Copper · Mines · Under construction · about 32 km away
- Eskay Creek Mine · Mines · Proposed · about 37 km away
- Jade Lake Power Project · Dams and power generation · Proposed · about 62 km away (an approximate location)
- Treaty Creek Terminal - Transmission Load Interconnection (KSM) Project · Transmission lines · Under construction · about 62 km away (an approximate location)
- Iskut (Bronson Slope) Copper/Gold/Silver/Molybdenum Mine · Mines · Proposed · about 63 km away
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- On hold BC Major Projects Inventory:
On hold
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 2326 (as of 30 Sep 2025)
Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.