Treaty Creek Terminal - Transmission Load Interconnection (KSM) Project

BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Under constructionreported 30 Sep 2025
Value
C$168Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Not published
Last checked
30 Sep 2025

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 30 Sep 2025
  4. CompleteNot yet

This project is to facilitate the interconnection of Kerr-Sulphurets-Mitchell (KSM) Mine to BC Hydro's transmission system. Under BC Hydro's standard tariffs and policies, the customer is required to pay for a portion of this project's costs.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Transmission lines (line) · Transmission lines in British Columbia
Location
Stewart (approximate location: placed at the municipality)
Municipality
Stewart
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q4 2028 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Under construction BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.