Build Almanac

Menu

Show on map

Jade Lake Power Project

BC Major Projects Inventory: Proposed: Preliminary/Feasibility (as of 30 Sep 2025)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Proposedreported 30 Sep 2025
Value
C$360Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Syntaris Power Corp.
Last checked
30 Sep 2025

Stage timeline

  1. Proposedreported 30 Sep 2025
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

Proposed 120 MW Jade power cluster will have 4 intakes; Kinskuch River, Jade Creek, ZZ-4 Creek and Tchitin River located above Kinskuch Lake 27 km east of Stewart.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Dams and power generation · Dams and power generation in British Columbia
Location
Stewart (approximate location: placed at the municipality)
Municipality
Stewart
Province or state
British Columbia, Canada · All of Canada

Nearby projects

Latest updates

Stage history

  1. Proposed BC Major Projects Inventory: Proposed: Preliminary/Feasibility (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.