Juan de Fuca Power Cable

BC Major Projects Inventory: Proposed (as of 30 Sep 2025)

Stage
Proposedreported 30 Sep 2025
Value
C$480Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Sea Breeze Pacific Juan de Fuca Cable, LP
Last checked
30 Sep 2025

Stage timeline

  1. Proposedreported 30 Sep 2025
  2. ApprovedNot yet
  3. Under constructionNot yet
  4. CompleteNot yet

Proposed construction of a 550 MW direct current line that would connect Vancouver Island to the Pacific Northwest power grid. The National Energy Board approved the Juan de Fuca cable project in Sep 2006.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Transmission lines (line) · Transmission lines in British Columbia
Location
Esquimalt
Municipality
Esquimalt
Province or state
British Columbia, Canada · All of Canada

Nearby projects

Latest updates

Stage history

  1. Proposed BC Major Projects Inventory: Proposed (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.