Build Almanac

Menu

Show on map

Belleville Terminal Redevelopment

BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Under constructionreported 30 Sep 2025
Value
C$416Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
BC Ministry of Transportation and Transit
Last checked
30 Sep 2025

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 30 Sep 2025
  4. CompleteNot yet

Demolition of existing Clipper Terminal infrastructure and construction of new consolidated preclearance terminal building with modern border security standards that abide by the Land, Rail, Marine, and Air Transport Preclearance Agreement between the Government of Canada and the USA.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Ports (terminal) · Ports in British Columbia
Location
Victoria (approximate location: placed at the municipality)
Municipality
Victoria
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q4 2028 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Under construction BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.