2L143 - Cable Replacement Project

BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

May be complete: the estimated completion (Q3 2026) has passed, and no newer source says so either way.

Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.

Stage
Under constructionreported 30 Sep 2025
Value
C$100Mfrom BC Major Projects Inventory
Capacity
Not published
Owner
Not published
Last checked
30 Sep 2025

Stage timeline

  1. ProposedNot reported
  2. ApprovedNot reported
  3. Under constructionreported 30 Sep 2025
  4. CompleteNot yet

This project is to address reliability, environmental, and seismic risks associated with the existing transmission cable 2L143 between Horsey substation and Esquimalt substation and to address load growth.

From the project's description in B.C. Major Projects Inventory, Open Government Licence – British Columbia; shortened to whole sentences where long.

Facts

Type
Transmission lines (line) · Transmission lines in British Columbia
Location
Victoria (approximate location: placed at the municipality)
Municipality
Victoria
Province or state
British Columbia, Canada · All of Canada
Estimated completion
Q3 2026 from BC Major Projects Inventory

Nearby projects

Latest updates

Stage history

  1. Under construction BC Major Projects Inventory: Construction started (as of 30 Sep 2025)

Sources

Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.

Something wrong or out of date? Report a correction.