Point Hope Maritime Shipyard Expansion
BC Major Projects Inventory: Proposed: Consultation/Approvals
(as of 30 Sep 2025)
- Stage
- Proposedreported 30 Sep 2025
- Value
- C$30Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- Not published
- Last checked
- 30 Sep 2025
Stage timeline
- Proposedreported 30 Sep 2025
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
Shipyard expansion at 345 Harbour Rd to include graving dock, extension of rail spur lines and a building to accommodate United Engineering and Island Plate and Steel. The project requires a preliminary facilities alteration permit from Transport Canada.
Facts
- Location
- Victoria
- Municipality
- Victoria
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- 2L143 - Cable Replacement Project · Transmission lines · Under construction · about 2 km away (an approximate location)
- Belleville Terminal Redevelopment · Ports · Under construction · about 2 km away (an approximate location)
- Juan de Fuca Power Cable · Transmission lines · Proposed · about 4 km away
- Highway 1 Bus on Shoulder - McKenzie to Colwood Interchange · Transit · Under construction · about 7 km away (an approximate location)
- Sooke Wind Project · Dams and power generation · On hold · about 31 km away
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Proposed BC Major Projects Inventory:
Proposed: Consultation/Approvals
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 2766 (as of 30 Sep 2025)
Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.