Highway 1 Bus on Shoulder - McKenzie to Colwood Interchange
BC Major Projects Inventory: Construction started
(as of 30 Sep 2025)
Approximate location: the source names only the municipality, so the map places this project at a point inside it (from Statistics Canada's census subdivisions), not at its site.
- Stage
- Under constructionreported 30 Sep 2025
- Value
- C$95Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Last checked
- 30 Sep 2025
Stage timeline
- ProposedNot reported
- ApprovedNot reported
- Under constructionreported 30 Sep 2025
- CompleteNot yet
Project includes Highway 1 widening to accommodate a 4.0m wide bus on shoulder lane, proposed pedestrian bridge along the Galloping goose trail, rock cut, retaining walls and drainage upgrades.
Facts
- Location
- Saanich (approximate location: placed at the municipality)
- Municipality
- Saanich
- Province or state
- British Columbia, Canada · All of Canada
- Estimated completion
- Q4 2027 from BC Major Projects Inventory
Nearby projects
- Juan de Fuca Power Cable · Transmission lines · Proposed · about 5 km away (an approximate location)
- Point Hope Maritime Shipyard Expansion · Ports · Proposed · about 7 km away (an approximate location)
- 2L143 - Cable Replacement Project · Transmission lines · Under construction · about 8 km away (an approximate location)
- Belleville Terminal Redevelopment · Ports · Under construction · about 8 km away (an approximate location)
- Sooke Wind Project · Dams and power generation · On hold · about 30 km away (an approximate location)
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- Under construction BC Major Projects Inventory:
Construction started
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 4882 (as of 30 Sep 2025)
Licences: Open Government Licence – Canada; Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.