Sooke Wind Project
BC Major Projects Inventory: On hold
(as of 30 Sep 2025)
- Stage
- On holdreported 30 Sep 2025
- Value
- C$750Mfrom BC Major Projects Inventory
- Capacity
- Not published
- Owner
- TimberWest Forest Corp./EDP Renewables
- Last checked
- 30 Sep 2025
Stage timeline
- ProposedNot reported
- ApprovedNot yet
- Under constructionNot yet
- CompleteNot yet
On hold reported 30 Sep 2025
Proposed 300 MW wind farm in the Sooke area with 100 to 150 turbines. Project placed on hold.
Facts
- Location
- Sooke
- Municipality
- Sooke
- Province or state
- British Columbia, Canada · All of Canada
Nearby projects
- Juan de Fuca Power Cable · Transmission lines · Proposed · about 28 km away
- Highway 1 Bus on Shoulder - McKenzie to Colwood Interchange · Transit · Under construction · about 30 km away (an approximate location)
- Point Hope Maritime Shipyard Expansion · Ports · Proposed · about 31 km away
- 2L143 - Cable Replacement Project · Transmission lines · Under construction · about 33 km away (an approximate location)
- Belleville Terminal Redevelopment · Ports · Under construction · about 33 km away (an approximate location)
Latest updates
- : first recorded here. BC Major Projects Inventory, 30 Sep 2025 edition.
Stage history
- On hold BC Major Projects Inventory:
On hold
(as of 30 Sep 2025)
Sources
- BC Major Projects Inventory: MPI project 3182 (as of 30 Sep 2025)
Licences: Open Government Licence – British Columbia. Full credits: Data sources and licences.
Something wrong or out of date? Report a correction.